Request a Demo

Fill out the form, and we'll get in touch as soon as possible.

PREVIEW

Chart Vizzard

Vizzlo's AI-based chart generator
Learn more and give it a try
Graphs Layered Timeline

Create your Layered Timeline in seconds

Make an attractive timeline to visualize overlapping and concurrent processes with ease.

Layered Timeline example: Project Plan
Layered Timeline example: The Chart of Accounts: Redesign Project
See more Layered Timeline examples

Create your chart in 3 simple steps

  1. Create new Layered Timeline
  2. Add your data
  3. Export or share

Why Vizzlo?

  • Create professional charts in seconds
  • Fully customizable, no design skills needed
  • Create directly in PowerPoint & Google Slides
What is a layered timeline?

A layered timeline is a graphical visualization of time periods that might or not overlap. Compared to a standard timeline that shows pinpointed single events, the layered timeline accurately expresses the duration/length of whole processes or events. Like in a Gantt chart, each bar/layer represents one process/task, with a start and an end date.

Vizzlo’s layered timeline is elegant and very intelligible. All elements are easy to identify: even if your tasks/processes happen at the same time, they get organized into visible overlapping layers, with different colors and sizes.

How to make a layered timeline with Vizzlo?

Use this designer-grade timeline to illustrate processes or project tasks and milestones in a matter of minutes! Follow these easy steps to create your chart online:

  • Click on any layer to directly edit it. You can also use the active card on the sidebar as a support to enter your data.
  • Pull the sides to adjust the length/duration of your processes.
  • Grab the dotted handles on the top of the layers to rearrange them.
  • Drag and drop the layers to adjust their position along the time axis.
  • Hover the mouse below the time axis to add your milestones.
  • Explore the possibilities of the “APPEARANCE” tab to refine the look of your timeline.
Layered timeline: key features
  • Custom date formats and colors
  • Optional milestones
  • Adjustable height

Pro tip: Quickly add a larger amount of data using the spreadsheet. Make sure to match the date formats before you import or paste your data.

Layered Timeline: What's new?
Sep 13, 2023

The maximum amount of records is increased to 100.

Read more in our Changelog.
This plugin was last updated: 7/3/2026, 10:53:23 AM

Enhance your productivity

Create a Layered Timeline directly in the tools you love

Vizzlo PowerPoint screenshot

Create a Layered Timeline in PowerPoint with
Vizzlo's add-in

Vizzlo Google Slides screenshot

Create a Layered Timeline in Google Slides with
Vizzlo's exclusive add-on

Loved by professionals around the world

huawai-logopwc-logouber-logosanofi-logoibm-logoadidas-logodeloitte-logo

Visualizations your audience won’t forget

Convey abstract concepts and data with professionally designed
charts and graphics you can easily edit and customize.